Checking a closet opening before ordering bifold doors
- Finish Carpentry
- Closets & Shelving
- Remodeling
Bifold and bypass units come cut to a nominal opening, and the opening in an older house is rarely nominal. Measure the height in one place, order to it, and the door binds at the jamb where the floor rose half an inch. The T1M Utility stores each reading against the opening as it is taken, so both jamb heights and the width at head and floor sit in one named list. What goes on the order is the set of real dimensions, not the one number somebody remembered.
How the opening gets checked
- Take the height at both jambs, not one
- T1M stores readings against the opening
- Width checked at the head and at the floor
- Order to the set, not the one number
- T1M named list keeps openings separate
The video checks a closet with both the T1 and the T1M: shelf and opening readings taken inside the box, 10 and 9, then two heights at different points of the opening, 78 5/8 and 81 5/8. That spread is the reason the check exists. One height is not the opening, and the unit gets ordered to the whole set rather than to a single reading.
proven favorites
Best Selling Tools
SHOP ALL
BOLDR PRO SOFTWARE
Practical Tools For Every Part Of The Job
Capture measurements with REEKON tools, then use them where the work happens.

100,000+ Customers
Get Started Today
Get more done and reduce errors immediately with REEKON digital measuring tools. Try today risk-free for 30 days and see for yourself.
Reduce Costly Errors
Standardize Workflows
Enter Into Any Software
SHOP NOW



