Documenting outlet and stub locations on a boarded wall
- Electrical
- Rough-In
- BOLDR Max
Once the board is up, an outlet box and a coiled stub are two features on a blank wall that nobody can place again without opening it. Using both lasers on the T1R Range to fix each position and letting the glasses record the walk gives BOLDR Max a model of that wall with the heights labelled, so the finish trade works from dimensions rather than from a photograph and a guess.
Fix it before the finish trade
- A boarded wall hides what is behind it
- An outlet and a stub need placing again
- Both lasers fix each position
- BOLDR Max labels the heights
- Dimensions instead of a photo and a guess
A boarded room with taped joints carries a single outlet box and a coiled green wire stub left out of the wall. The clip carries a BOLDR MAX badge and returns a 3D model of the same wall with the two features tagged at their heights, one in the forties and one in the teens, measured off the floor.
proven favorites
Best Selling Tools
SHOP ALL
BOLDR PRO SOFTWARE
Practical Tools For Every Part Of The Job
Capture measurements with REEKON tools, then use them where the work happens.

100,000+ Customers
Get Started Today
Get more done and reduce errors immediately with REEKON digital measuring tools. Try today risk-free for 30 days and see for yourself.
Reduce Costly Errors
Standardize Workflows
Enter Into Any Software
SHOP NOW



