How do you work out the volume of a footing pour?
- Concrete
- Site Prep
- Estimating & Takeoff
Ordering concrete is a one-way decision: short and you are cold-jointing a footing, long and you are paying for a truck to leave with your money in it. The T1R Range takes length, width and depth as three shots into an open excavation and returns the volume on the tool, so the figure is worked from the hole that actually got dug rather than from the dimension on the drawing. Nobody has to climb down into the trench to hold a tape.
How the pour gets sized
- Short means a cold joint in the footing
- Three shots: length, width and depth
- T1R returns the volume on the tool
- 66 cubic feet off the hole as dug
- No climbing into the T1R measurement
An excavation is measured on a site with an excavator and a plate compactor working alongside and timber formwork already set against the trench wall. Three readings are taken with the tool, shooting down the length, then across the width, then the depth, and the display returns sixty-six cubic feet. The trench is never entered to take a measurement.
proven favorites
Best Selling Tools
SHOP ALL
BOLDR PRO SOFTWARE
Practical Tools For Every Part Of The Job
Capture measurements with REEKON tools, then use them where the work happens.

100,000+ Customers
Get Started Today
Get more done and reduce errors immediately with REEKON digital measuring tools. Try today risk-free for 30 days and see for yourself.
Reduce Costly Errors
Standardize Workflows
Enter Into Any Software
SHOP NOW