Marking a long line on a slab without a chalk line
- Concrete
- Layout
- One-Handed Use
Slab layout alone is a fight with the tape. A blade that collapses at six feet gets walked back and restarted, and snapping a chalk line for one plate mark means stringing, holding and dusting a floor somebody else has to work on. The T1 Tomahawk stands out far enough to reach across the bay in one pull and throws a green line along the blade, so the mark and the dimension come from the same setup. The number is captured for the plate cut list at the same moment.
How the line gets drawn and read
- T1 blade stands out across the bay in one pull
- T1 green laser line runs along the blade
- Mark and dimension from one setup
- No chalk line, no second pair of hands
- Reading captured for the plate cut list
The video pulls the T1 off a belt, extends the blade out past six and a half feet, then works a board on a concrete floor with the green laser line running along it and marks off the reading. Three separate steps, reach, line and number, happen without setting the tool down or asking anyone to hold the far end.
proven favorites
Best Selling Tools
SHOP ALL
BOLDR PRO SOFTWARE
Practical Tools For Every Part Of The Job
Capture measurements with REEKON tools, then use them where the work happens.

100,000+ Customers
Get Started Today
Get more done and reduce errors immediately with REEKON digital measuring tools. Try today risk-free for 30 days and see for yourself.
Reduce Costly Errors
Standardize Workflows
Enter Into Any Software
SHOP NOW



