How do you find pipes before cutting into a floor?
- Flooring
- Rough-In
Once topping or finish floor covers a slab, every penetration you did not record becomes a guess with a saw in your hand. The T1R Range measures each pipe position from a fixed datum and saves it to a list on the tool, so the as-built exists before the cover goes on. Anyone coring or fastening later works from recorded positions instead of memory.
How the positions get recorded
- T1R measures each pipe from a fixed datum
- Positions saved to a list, not remembered
- Recorded before the cover goes on
- Later coring works from the as-built
- Beats a hopeful pass with a locator
Locate and record them while they are still visible. Before flooring covers the slab, measure to each pipe and save the positions, so the run is documented before anyone puts a blade or a fastener through it. Once the floor is down those locations only exist in whatever you wrote at the time.
proven favorites
Best Selling Tools
SHOP ALL
BOLDR PRO SOFTWARE
Practical Tools For Every Part Of The Job
Capture measurements with REEKON tools, then use them where the work happens.

100,000+ Customers
Get Started Today
Get more done and reduce errors immediately with REEKON digital measuring tools. Try today risk-free for 30 days and see for yourself.
Reduce Costly Errors
Standardize Workflows
Enter Into Any Software
SHOP NOW