Flatwork is ordered by volume, and a short pour is a cold joint you did not plan for. Measuring each panel with the T1M Utility saves length and width straight into the app, and the volume calculator turns that set plus a three and a half inch depth into cubic yards and a bag count. You order against measured panels rather than a pace count, and the numbers stay on file if the quantity is ever questioned.
How the bag count is worked out
- T1M saves each panel's length and width
- Volume calculator returns cubic yards and bags
- Depth held at three and a half inches
- Ordered off measured panels, not a pace count
- Avoids a cold joint from a short pour
Sidewalk replacements are a stack of slabs at the same depth and different lengths. Measure each one, hold the depth at three and a half inches, and the calculator turns the set into total volume and a bag count. The order is right before the truck leaves, which beats coming up two bags short in the middle of a pour.
proven favorites
Best Selling Tools
SHOP ALL
BOLDR PRO SOFTWARE
Practical Tools For Every Part Of The Job
Capture measurements with REEKON tools, then use them where the work happens.

100,000+ Customers
Get Started Today
Get more done and reduce errors immediately with REEKON digital measuring tools. Try today risk-free for 30 days and see for yourself.
Reduce Costly Errors
Standardize Workflows
Enter Into Any Software
SHOP NOW